Fibre Channel (SAN)

Reply
N/A
Posts: 1
Registered: ‎11-30-2005

Upgrade order for SAN switches - Director first or Edge switches?

We are planning of upgrade of our Brocade SAN fabric and want to know if we need to upgrade the 4/256 Director first, or the 9 Edge switches first. The edge switches are 4/16s, 2/32, and HP Blade Brocade SAN switches.

What is the best practice for this?

Thanks,

Patti

Join the Community

Get quick and easy access to valuable resource designed to help you manage your Brocade Network.